January 2026
A ground-up commercial build for Morris Excavating, from full site infrastructure design through the finished interior. The facility runs on an 800 amp three-phase service with a standby generator for backup power.
Services Provided:
800 amp three-phase service
Full site infrastructure design
Ground-up build
Interior buildout
Mechanic shop automation
Wash bay design and install
Geothermal design and install
Fire alarm install
Exterior lighting design
Standby generator