2025
A four-bin grain site powered by a 400 amp single-phase service. Each bin and its controls were wired individually, and the site was laid out to allow room for future growth.
Services Provided:
400 amp single-phase service
Four-bin site integration
Individual bin and control wiring
Layout planned for future growth